MSC.1/Circ.1464/Rev.1/Corr.1 14 November 2013 ENGLISH ONLY UNIFIED INTERPRETATIONS OF SOLAS CHAPTERS II-1 AND XII, OF THE TECHNICAL PROVISIONS FOR MEANS OF ACCESS FOR INSPECTIONS (RESOLUTION MSC.

MSC.1-Circ.1464-Rev.1-Corr.1 - Corrigendum (Secretariat)

MSC.1/Circ.1464/Rev.1/Corr.1 14 November 2013 ENGLISH ONLY

UNIFIED INTERPRETATIONS OF SOLAS CHAPTERS II-1 AND XII, OF THE TECHNICAL PROVISIONS FOR MEANS OF ACCESS FOR INSPECTIONS (RESOLUTION MSC.158(78)) AND OF THE PERFORMANCE STANDARDS FOR WATER LEVEL DETECTORS ON BULK CARRIERS AND SINGLE HOLD CARGO SHIPS OTHER THAN BULK CARRIERS (RESOLUTION MSC.188(79))
Corrigendum
The second sentence of subparagraph 2 of paragraph 5.4 of the annex is replaced with "Starting and connection to the main switchboard of one generator should be as rapid as possible, preferably within 30 seconds after loss of power.".
___________
09:56
RSS
No comments yet. Be the first to add a comment!
Loading...